Video
18 Mar 2026

BioEngineering

Since the 1970s, we at Bioengineering have been working with great passion on solutions which are driven forward by research and production. This allows us to create systems for a wide range of industries in laboratories and production facilities across the world; this in turn has produced some rather special and lasting customer relationships – something we are extremely proud of. But the most beautiful thing about our history is that we continue to write it every day.

Content provided by our supplier

Pharmadule-Morimatsu

  • Country/Region:
    Italy
  • On CPHI since:
    2025
  • Certificates:
    5
  • Employees:
    5000+
Company types
Engineering
Machinery and Equipment Supplier/Manufacturer

Other Content from Pharmadule-Morimatsu (2)

  • Video Fabrication of Fast Track Process Systems

    Fabrication of Fast Track Process Systems enables pharmaceutical and biotech manufacturers to bring new capacity online in a fraction of the time of traditional stick‑built projects. By modularizing process units into pre‑fabricated skids and pipe racks, critical activities such as detailed engineering, procurement, fabrication and FAT run in parallel, while site construction progresses in the background. The result is a fully tested, plug‑and‑play process system that arrives on site ready for rapid installation, commissioning and qualification, reducing risk, shortening schedules and accelerating time‑to‑market for new therapies.
  • Video Modular Facility Fabrication and Installation

    Modular Facility Fabrication and Installation transforms the way pharmaceutical plants are built, by manufacturing complete facility modules off‑site and assembling them rapidly on the customer’s site.

    These modules integrate structure, cleanrooms, process and utility systems in a controlled workshop environment, ensuring consistent quality, GMP compliance and a very high level of construction cleanliness. Once shipped, the modules are set on prepared foundations and quickly interconnected, allowing commissioning and qualification to start within days and cutting overall project timelines by months compared to conventional construction