Biotechnology and related specialities
Biotechnology and related specialities Companies (65)
Biotechnology and related specialities News
-
News Women in Pharma: The philosophy of pharmaceutical leadership
In this latest instalment of our Women in Pharma series, we sit down with Clarissa Sowemimo-Coker, Chief Strategy Officer at Ambrose Healthcare and CPHI Middle East Advisory Board Member.
-
News Frontier Biotech and GSK Forge RNA Therapy Partnership
Frontier Biotechnologies and GSK have entered a global licensing agreement to advance small interfering RNA (siRNA) therapeutics. This collaboration grants GSK exclusive rights to develop and commercialise two promising siRNA candidates, marking a mile... -
News Merck KGaA to buy US biotech SpringWorks for US$3.9 billion
The German multinational pharmaceutical company Merck KGaA have signed a deal to buy US biotech company SpringWorks Therapeutics at an equity value of US$3.9 billion in a move to add rare cancer therapeutics to their pipelines.
-
News Trump's federal funding shift could stifle biotech innovation
Over a month into the second term of Donald Trump’s presidency and we have already seen some big changes affecting the healthcare industry.
Biotechnology and related specialities Products (89)
-
Product ELMED BIOSHIELD
ELMED BIOSHIELD is a multi-microbial agricultural formulation developed to support healthier soils, stronger root systems, nutrient mobilization and improved crop performance. It combines beneficial microorganisms for biofertilizer and biocontrol support and is designed for use in seed treatment, soil appl...
-
Product Single-use 3D Collapsible Cubic Liquid Storage Bag
Collapsible cubic liquid storage bag/3D liquid storage bag from Duoning is a product specially developed for liquid storage and transfer in the biopharmaceutical environment. The bags are available from 50 L to 3000 L and can be customized according to customers' requirements. The DuoFilm-001 film used in ...
-
Product Flip-off Seals
Flip Off Seals are tamper-evident aluminium and plastic closures designed to secure and protect injectable vials. They provide a reliable seal integrity while allowing easy access to the rubber stopper by simply flipping off the plastic top.
Made from high-quality aluminium and polypropylene, ...
-
Product Multicompendial TRIS AMINO and TRIS Amino Ultra Pure reagents
Advancion is the world’s only fully integrated manufacturer of globally compliant TRIS AMINO™ reagents for use in a variety of demanding pharmaceutical and biotechnology applications. With more than 50 years of TRIS manufacturing experience, we continue providing TRIS AMINO grades that meet the dynamic nee...
-
Product Probiotics powder
Akk11® (Akkermansia muciniphila) is a next-generation probiotic developed by Wecare Probiotics for metabolic health and healthy aging applications. Supported by 6+ clinical trials, 10+ SCI publications, and 10+ patents, Akk11® demonstrates promising benefits in weight management, glucose metabolism, metabo...
-
Product AseptiMix™ MI Mini
Specially designed MDI AseptiMix™ MI Mini 3D mixer bags provide validated and reliable mixing solutions for these biopharmaceutical process requirements. These single use disposable pre-sterilized mini mixer systems can be used to mix very small volumes starting from 400 mL
These systems also address ...
-
Product Ethylenediamine BP
Ethylenediamine BP is a high-purity aliphatic diamine compliant with British Pharmacopoeia standards. It is a reactive building block widely used in chemical synthesis, pharmaceutical intermediates, and industrial formulations due to its strong basicity and bifunctional amine groups.
-
Product BIOTECHNOLOGY
RENOLIT Healthcare supplies high-performance films for single-use biotech systems, replacing traditional glass and stainless steel in media storage bags, bioreactors, mixing vessels, and sampling containers.
Our INFUFLEX barrier films feature ultra-pure PE layers with oxygen barriers, deliveri...
-
Product HEMATOLOGY ANALYZER
3-part differentiation of WBC, 23 parameters +3 histograms · Low sample volume: 10m blood · Unique dilute program, independent HGB detection system · Up to 60 samples per hour · Automatic probe cleaning & sample dilution · Large color LCD display · Data storage of 30,000 sample with histogram
-
Product CDMO Services
SPL's CDMO business unit specializes in extractions and purifications from natural sources such as plant and animal tissues and we are experts in porcine-derived API's. We are able to support projects from pre-clinical stages all the way though full commercialization.
-
Product D-Galactose (Plant Derived), cGMP Excipient
D-Galactose, plant derived, is suitable for use as a cGMP chemical in pharmaceutical manufacturing processes and products. It is intended for use upstream and downstream in biological drug manufacturing processes. For this purpose, BioSpectra has categorized our product as an excipient though one of the pr...
-
Product Agentic Aritificial Intelligent Voice Enabled - No Code Robotics & Automation Solution
No CodeAgentic AI driven
Voice Enabled
Life Science Robotic Application
Bacterial Colony Handling, Cell Culture, iPSC'S Stem cells, Tissue Culture, Cell & Gene Therapy, Sterile Solutions
-
Product Mixers / Agitator
Top entry mixers for All type of liquid , semi liquid and high homogenisations mixing
-
Product Endogermila®
Endogermila® is a ready-to-use Bacillus clausii spores suspension developed to support digestive wellness and help restore gut microbial balance during and after gut disturbances. The spore-based formulation offers resilience to stomach acid and is presented in a convenient oral vial format for easy admini...
-
Product ELMED SYMBIO
ELMED SYMBIO is an advanced multi-microbial formulation developed for sustainable agriculture and improved soil and rhizosphere health. The formulation combines beneficial bacteria, fungi and arbuscular mycorrhizal fungi (AMF) to support nutrient availability, root development and efficient nutrient and wa...
-
Product AQUA BIOFORT
AQUA BIOFORT is an advanced microbial formulation developed by ELMED Life Sciences for aquaculture applications. With 5 Billion CFU/g, it combines beneficial PGPR, photosynthetic and nitrifying microorganisms to support nutrient mobilization, organic matter biodegradation and microbial balance in aquacultu...
-
Product AQUA FORTIS
ELMED AQUA FORTIS is a 5.5 Billion CFU wettable powder microbial formulation developed for aquaculture pond ecosystem management. The formulation combines Lactobacillus, beneficial Bacillus, photosynthetic bacteria and a cocktail enzyme blend to support gut health, microbial balance, water quality manageme...
Upcoming Events
-
CPHI India 2026
IICC, Yashobhoomi, Dwarka, Delhi
23 Nov 2026 - 25 Nov 2026 -
PMEC India 2026
IEML, Greater Noida, Delhi
24 Nov 2026 - 26 Nov 2026 -
Pharmapack Europe 2027
Paris Expo, Porte de Versailles - Hall 4 | Paris, France
27 Jan 2027 - 28 Jan 2027



